One supply change.
A different plant to review.

“Take the carbon dioxide from biogas upgrading instead.” Follow the equipment, quantities and calculations affected by that request.

Skip to the decision ↓
100 MW electrolysis / Power-to-methaneReference design
Drag to inspect · Select a numbered note

The incoming change is specific.

Replace flue-gas capture with CO₂ from biogas upgrading. Start from the accepted source design.

Existing Nordform pre-design study · 100 MW electrolysis. Source-based layout geometry, including equipment envelopes, steel and services; no engineering approval. Figures follow stated assumptions, with pre-design accuracy of ±30–40%. Two calculated snapshots; orchestration is illustrated. No AI call or customer-project change.

The decision to review

Is a different CO₂ supply worth changing the plant for?

The reference calculation removes the amine capture train and updates the balance, quantities and costs. Methane output remains 51.9 MW under the stated assumptions.

What changes
Capture equipment and associated lines; heat balance and estimated investment.
What needs checking
CO₂ quality, supply reliability, conditioning duty and connection requirements.
Prepared next step
Compare the supply terms and technical requirements before accepting the revision.
01

The starting point

A site layout, equipment, steel frames, cable trays and declared process assumptions. The model connects the physical design to the balance and cost calculation.

02

The affected work

The CO₂-source input selects a defined branch of the existing kernel. It removes the capture train and associated lines, then recomputes the balance, quantities and estimate.

03

The engineering decision

A lower reference estimate is one input. The responsible engineer still needs supply quality and availability, equipment specifications, hazard assessment and an agreed design basis.

This demonstrates a bounded change in a supported family. It does not establish arbitrary change-impact detection, process simulation, hydraulic sizing or safety approval.

Open the existing interactive plant demo

A practical place to start

What changes in your product family?

Show us the design, what needs to change and the delivery date. We’ll agree the work, files and price.

Bring us a change